THE IMPORTANCE OF THE DESIGN PHASE DURING PRE-CONSTRUCTION

A successful construction project goes through several stages, but the design stage is arguably the most crucial one. Before construction work starts, the stakeholders, architect, and general contractor gather to review the architectural plans, construction documents, and budget.

Schematic design, design development, construction documents, and construction administration are the four subphases that make up the design phase. Below, we'll go into more detail about these.


Schematic Design

The construction project has only existed as a concept on paper up to this point, based on the developer's or business owner's vision. Using this data, the architect will produce a schematic design for the proposed construction project. It is a simple rendition that makes the project more understandable. Stakeholders and the general contractor will be able to see the project for the first time. Before continuing with the next stage of the design phase, all stakeholders will offer their feedback, and any necessary changes will be documented.

Design Development

The design development is where the building starts to take shape, as opposed to the schematic which is merely an outline or rough sketch of the project. The building owner or developer will collaborate with the architect to choose the project's building materials, colors, and other features. The end result will be a vividly detailed 3-D rendering of the completed structure. The owner and contractor can now see the building's elevation, entryways, roofing, windows, and other structural details like landscaping.

Additionally, it is the last chance for the company owner and other interested parties to change the design before the building permit construction documents are finished and ready for approval.

Construction Documents

Following approval of the final construction design by the building owner or developer, the architect will create a complete set of construction documents and technical drawings for the project. To obtain authorization for the building permit, the paperwork is delivered to your neighborhood municipality. Building approvals are not given automatically, and the time it takes to get them varies. The building department has the authority to accept the construction documents as they are, ask for modifications, or refuse the permit. Working with an architect and a commercial builder with construction experience in your municipality is frequently a good idea.

Construction Administration

The architect turns over the project to the general contractor to start the construction phase of the project after the building permit has been approved. Working with a design-build contractor will help building owners and developers to streamline the pre-construction procedure. Owners and developers can save time and money by working with a design-build contractor instead of hiring an architect for the design phase and then having the work bid out to one or more contractors for the construction phase.

3 views0 comments